What was found
AFT PRESSURE BULKHEAD OIL CANNED BETWEEN STR 7 LT AND BL 0 INSTALLED REPAIR PER ECRA 5311-01526 PART 1 NEED TO REINSPECT PER ECRA 5311-01526 PART 2 BEFORE THE ACCUMULATION OF 46734 TOTAL A/C FLT CYCLES PLANNING TO CONTACT ENGINEERING AFTER 42000 FLT CYCLES BUT BEFORE 43000 FLT CYCLES FOR INSPECTION DETAILS. ACCOMPLISH INSPECTIONS ON THE STA 1016 APB LT DOME REPAIR PER ECRA 5311-01526,PT 2 BEFORE THE ACCUMULATION OF 46,734 TOTAL AIRCRAFT FLIGHT CYCLES. PLANNING CONTACT ENGINEERING AFTER 42,000 BUT BEFORE 43,000 TOTAL FLIGHT CYCLES.DIP CTL#10608.