What was found
AFT PRESSURE BULKHEAD HAS OIL CANNING AT WL 296.23 BETWEEN STR 2 & 3 RT 5.00 X 7.25 AND.200 DEEP REF WC 425, STEP 1 INSTALLED REPAIR IAW ECRA 5311-01468, REINSPECT BEFORE THE CORRECTION, SHOULD READ: INSTALLED REPAIR ACCUMULATION OF 46950 TOTAL FLT CYCLES AND AT INTERVALS NOT TO IAW ECRA 5311-01468, REINSPECT BEFORE THE ACCUMULATION OF EXCEED 24000 FLT CYCLES THEREAFTER IAW PART 2 OF EC 5311-01468 46,950 TOTAL FLT CYCLES AND AT INTERVALS NOT TO EXCEED 24,000 FLT REF DIP 01698 CYCLES THEREAFTER IAW PART 2 OF ECRA 5311-01468. INTERIM REPAIR ACCOMPLISHED IAW ECRA 5311-01468, PART 1. BEFORE THE ACCUMULATION OF 46,950 TOTAL ACFT FLIGHT CYCLES, AND AT INTERVALS NOT TO EXCEED 24,000 FLIGHT CYCLES THEREAFTER, PERFORM AN INSPECTION IAW PART 2 OF ECRA 5311-01468. INIT: W/I 46950 TOTAL ACFT F/C INIT WILL AUTO-ITO TO 2) RIR: EVERY 24000 F/C THEREAFTER.