What was found
RT MLG WW AT STA RBL 34 TO RBL 38-CRACK IN PRESS BULKHEAD AT APPROX S17R-S18R INSTALLED WEB REPAIR IN RT W/W REF SRM 57-10-10, REPAIR 3, ISSUED DIP TO INSPECT AREA AT INTERVAL OF 56,000 FLT CYCLES AND THEREAFTER AT 36,000 FLT CYCLES REF SRM 57-10-10. REPAIR 3 PARA 6 FOR INSP INTERVALS. ACCOMPLISH INSPECTION IAW SRM 57-10-10, REPAIR 3, PARAG 6 AT 56,000 FLT CYCLES AFTER REPAIR INSTALLATION AND EACH 36,000 FLT CYCLES THEREAFTER.