What was found
IAW A CHECK JOB CARD 4-2025. ITEM 23 RUDDER HYD ACT OPERATION CHECKED STEP E4. WHEN THE LEAK MEASURE B IS SELECTED THE B INDICATION ON ECAM STAYS GREEN & DOES NOT TURN AMBER. REPLACED SOLENOID VLV PCN 644-0070 IAW MM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
IAW A CHECK JOB CARD 4-2025. ITEM 23 RUDDER HYD ACT OPERATION CHECKED STEP E4. WHEN THE LEAK MEASURE B IS SELECTED THE B INDICATION ON ECAM STAYS GREEN & DOES NOT TURN AMBER. REPLACED SOLENOID VLV PCN 644-0070 IAW MM.