What was found
FUSELAGE FRAME HAS CRACK INDICATION AT STATION 400R BETWEEN STRINGER 8RT & STRINGER 9RT AT INBD HOLE A/C PSU SUPPORT BRACKET. STATION 400RT FRAME BETWEEN STRINGERS 8 & 9 RT WAS REPAIRED IN ACCORDANCE WITH EA 5310-04716 REV F FIGURE 3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FUSELAGE FRAME HAS CRACK INDICATION AT STATION 400R BETWEEN STRINGER 8RT & STRINGER 9RT AT INBD HOLE A/C PSU SUPPORT BRACKET. STATION 400RT FRAME BETWEEN STRINGERS 8 & 9 RT WAS REPAIRED IN ACCORDANCE WITH EA 5310-04716 REV F FIGURE 3.