What was found
GEN 1 DID NOT COME ON AT START UNTIL GEN SWITCH CYCLED, WHEN GEN 1 CYCLED DURING GND CHECKS, IT DID NOT COME ON FIRST TIME & SHOWED VOLTS. R & R NR 1 ENG IDG. OPERATIONS CHECK & LEAK CHECKED GOOD AMM 24-21-00-72 0-042.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
GEN 1 DID NOT COME ON AT START UNTIL GEN SWITCH CYCLED, WHEN GEN 1 CYCLED DURING GND CHECKS, IT DID NOT COME ON FIRST TIME & SHOWED VOLTS. R & R NR 1 ENG IDG. OPERATIONS CHECK & LEAK CHECKED GOOD AMM 24-21-00-72 0-042.