What was found
LEFT ELEV UPPER SURFACE HAS 6 FINDINGS FROM THERMOGRAPHY. LOCATIONS ARE 48 FROM INBD END & 20 FROM TE, 56 FROM INBD END & 21.5 FROM TE, 58 FROM INBD END & 14.25 FROM TE, 99.38 FROM OTBD END & 18 FROM TE, 53.5 FROM OTBD END & 6.5 FROM TE, 17 FROM LE & 6.5 FROM TE. ALL 6 FINDINGS WERE REPAIRED PER SRM 55-21-11 PARA 5 D FIG 204. THIS SRM REFERS TO SR I55-21-11-2-002-00 PARA 3B TABLE TABLE 203 TO INSPECTION AT PTC 60000 OR 120000T FROM COMPONENT DELIVERY. CURRENT PTC 17794 & PTT 41006T. ITEM CREATED FOR SRI INSPECTION REQUIREMENT. ALL REPAIRS WERE IAW SRM 55-21-11 CONFIG 1 & EACH INDIVIDUAL REPAIR WAS LESS THAN 1.55 SQ INCHES.