What was found
FRAME CRACKED AT STATION 760 RT SIDE OF FUSELAGE BETWEEN STRINGERS 8R & 9R AT PSU RAIL. REPAIR IAW SRM 53-00-07 SEE TASK & WIPS FOR WORK ACCOMPLISHED. ACC DV ISPECTION IAW SRM 53-00-07 REPAIR 1 AT 12K FLIGHT CYCLES FROM REPAIR OR 50K AIR FRAME CYCLES WHICHEVER COMES FIRST & THEN ACC DV INSPECTION OF REPAIR 12K FLT CYCLES THERE AFTER 53 DIP CONT 29980 SRM 53-00-07 REPAIR 1. ACCOMPLISH INSPECTION IAW TABLE 203 OF SRM 53-00-07 REPAIR 1 ZONE 3 AT THRESHOLD OF 12,000 FLT CYCLES FROM REPAIR INSTALL OR 50,000 AIRFRAME FLIGHT CYCLES WHICHEVER OCCURS FIRST. REPEAT INSPECTIONS AT INTERVALS OF 12,000 FLIGHT CYCLES THEREAFTER.