As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
LEFT PSU RAIL SUPPORT AT STATION 760 STRINGER 9L SHOWS POSSIBLE CRACK INDICATION AT RIVET. REPAIRED FRAME IAW SRM 53-00-07 REPAIR 1. SUPPLEMENTAL INSPECTION REQUIRED 12000 FLIGHT CYCLES FROM REPAIR INSTALLATION OR 50000 AIRFRAME FLIGHT CYCLES WHICHEVER COMES FIRST IAW SRM 53-00-07 TABLE 203 ZONE 3. REPEAT EVERY 12,000 FLIGHT CYCLE INTERVALS THEREAFTER IAW SRM 53-00-07.