What was found
DURING ACCOMPLISHMENT OF EA 5300-01721 REV C OP 02, WEAR WAS FOUND ON THE PN 65B02512-35 SKIN PANEL AT APPROX STATION 2589, STRINGER 3L. THE BLEND OUT EXCEEDED ALLOWABLE LIMITS IN SRM 53-00-01. DAMAGE WAS CUT OUT & A REPAIR DOUBLER INSTALLED IAW ECRA 5330-04936. THE FUSE SKIN REPAIR INSTALLED IAW ECRA 5330-04936 AT STATION 2589, STRINGER 3L HAS RECEIVED 1ST & 2ND STAGE APPROVAL. A NEW FORM 8100-9 SHOWING COMPLIANCE WITH CFR 26.43 D & 25. 571 MUST BE REC BEFORE ACFT REACHES PTT 71,618, CURRENT PTT 69,618. PLANNING CONTACT EG AFTER 23 NOV 14, BUT BEFORE 23 DEC 14.