What was found
WING CTR SECTION FRONT SPAR WEB LT SIDE INTERIM REPAIR EA 4700-01019. DOUBLER WAS MIS-LOCATED 2.12 INCHES HIGHER THAN REQ FIG 5 OP 006. PERFORMED INTERIM REPAIR IAW ECRA 5710-02443 PART 1. INITIATED ON OR BEFORE 3/11/16 ACCOMPLISH A PERMANENT REPAIR PLANNING TO CONTACT ENGINEERING AFTER 01/11/16 BUT BEFORE 02/11/16 FOR PERM REPAIR. ON OR BEFORE 11 MARCH 2016 ACCOMPLISH A PERMANENT REPAIR. PLANNING TO CONTACT ENGINEERING AFTER JAN 11 2016 BUT BEFORE 11 FEB 2016 FOR PERMANENT REPAIR. IAW ECRA 5710-02443 NOTE THIS REPAIR UNDER DTA.