What was found
FRAME CRACKED AT INBD FASTENER, PSU RAIL STATION 867, BETWEEN STRINGER 8R & 9R. INSTALLED DOUBLER REPAIR, SUPPORT BRACKET & APPLIED CORROSION INHIBITING COMPOUND IAW EA 5310-04716 REV I REPAIR 3 FIG 3, 8, 9, 12 & 13.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FRAME CRACKED AT INBD FASTENER, PSU RAIL STATION 867, BETWEEN STRINGER 8R & 9R. INSTALLED DOUBLER REPAIR, SUPPORT BRACKET & APPLIED CORROSION INHIBITING COMPOUND IAW EA 5310-04716 REV I REPAIR 3 FIG 3, 8, 9, 12 & 13.