What was found
DAMAGE FOUND AT STATION 787, STRINGER 26 IS OUT OF LIMITS IAW SRM 53-00-01 FIG G PG 115, W=2" Y=.082 = 24.39 MIN IS 30 INTERIM REPAIR PERFORMED AT STATION 787 - 807 FUSELAGE SKIN BETWEEN STRINGER 26R & 27L IAW ECRA 5331-02032 PART 1 53-DIP ISSUED. INSPECTION THRESHOLD ON OR BEFORE 50,000 TOTAL FC PLANNING TO CONTACT ENGINEERING AFTER 43,000 TOTAL FC BUT BEFORE 44,000 TOTAL FC FOR INSPECTION REQUIREMENTS.