What was found
FOUND CORROSION ON THE CASTING FITTING AT MAIN CABIN FWD WET AREA LBL 54, BETWEEN BS 266 AND 287. CORROSION REMOVED FROM CASTING AND FOUND OUT OF LIMITS IAW SRM 51-10-02, AND 53-00-51, FIG.101, DETAIL II. REMOVED AND REPLACED THE CASTING FITTING IAW SRM 51-40-02.