What was found
ON REMOVAL OF MAIN CABIN FLOOR BOX BEAM, DISCOVERED CORROISON ON THE ATTACHED SUPPORT CHANNEL BETWEEN BS 720 - 740, RBL 60 UPPER SURFACE. BLENDED THE CORROSION AND FOUND TO BE OUT OF LIMITS IAW SRM 53-30-15, FIG 101, DETAIL IV, ALLOWABLE DAMAGE I. REPLACED THE SUPPORT CHANNEL IAW SRM 51-40-02, AND DWG 143N5410.