What was found
CORROSION ON STGR 41L BETWEEN FR-68-69. REMOVED FASTENERS AND BLENDED OUT CORROSION ON STR 41L BETWEEN F R68-69, HFEC, ROTOPROBE AND UT THICKNESS ACCOMPLISHED. MATERIAL LOSS .030 MAX ALLOWED .040. PERFORMED REPAIR IAW SRM 53-00- 13-300-002, NTM 51-10-02, 51-10-04 AND 51-10-08 AND ER5100R017 REV E.