As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
RIGHT SIDE 727D FRAME CRACKED AT I/B RIVET FOR PSU RAIL ATTACH BRACKET, LOCATED BETWEEN S-8RT AND S-9RT IN CABIN. SEE L/P 962007 INITIATE A DTA DIP TO "ACCOMPLISH INSP ON OR BEFORE 50,000 FLT C YCLES. PLANING TO CONTACT ENGR AFTER 43,000 FLT CYCLES BUT NOT BEFORE 44,000 FLT CYCLES FOR INSPECTION REQUIREMESTS."