What was found
EGPR DOUBLER CRACKED IN ZONE 1 INTERIM REPAIR PERFORMED TO EGPR DOUBLER IAW ECRA 5331-02294 DTA DIP ACCOMPLISH INSP REQUIREMENTS ON OR BEFORE THE AIRCRACT REACHES 75000 TOT FLT CYCS PLANNING TO CONTACT ENGINEERING AFTER 68000 TOT FLT CYCS BUT BEFORE 69000 TOT FLT CYCS FOR THE INSP REQUIREMENTS EGPR DOUBLER CRACKED IN ZONE 1. PERFORMED REPAIR. ACCOMPLISH INSPECTION REQUIREMENTS BEFORE 75,000 TOTAL FLT CYCLES. PLANNING TO CONTACT ENGINEERING AFTER 68,000 TOTAL FLT CYC BUT BEFORE 69,000 TOTAL FLT CYC FOR INSPECTION REQUIREMENTS. TOMC-APPROVAL FROM SC1ELBYC COMMENT NOTED BY INSPECTION QC REVIEWED QC REVIEWED INSPECTIONS CREATED BY AUTODIP PENDING AIRCRAFT RECORDS AUDIT & UPDATE.