What was found
REF ECRA 5331-02331 AC730, FUSELAGE SKIN STA 867-887, STR 22L-24L INTERIM REPAIR. PART 1, ITEM 2 TO INITIATE A DIP ON OR BEFORE AIRCRAFT REACHES 50,000 TOTAL AIRCRAFT FLIGHT CYCLES, TO PERFORM AN INSPECTION PER PART 2 OF ECRA 5331-02331. PLANNING TO CONTACT ENGINEERING AFTER 47,000 CYCLES BUT BEFORE 48,000 CYCLES FOR THE INSPECTION REQUIREMENTS INITIATED DIP AS PER ABOVE REQUIREMENTS.