What was found
CRACK INDICATION IN FRAME LAYER AT FR16 L/H SIDE HOLE "D" REPAIR L/H FR16 CROSSBEAM BEFORE NEXT FLIGHT PER STEP 6 ACCOMPLISHED INTERIM REPAIR ON FRAME LAYER AT FR16 L/H HOLE D PER ECRA 5311-02131 PART 1, ACCOMPLISH INSPECTION REQUIREMENTS PER PART 2 OF ECRA 5311-02131 ON OR BEFORE THE A/C REACHES 74399 TOTAL FLIGHT CYCLES, PLANNING TO CONTACT ENGINEERING AFTER 72399 TOTAL FLIGHT CYCLES BUT BEFORE 73399 TOTAL AC FC''S FOR THE INSPECTION REQUIREMENTS APPROVED PER ECRA TO BE ACCOMPLISHED ON OR BEFORE 74399 TOTAL FLIGHT CYCLES, PLANNING TO CONTACT ENGINEERING AFTER 72399 TOTAL FLIGHT CYCLES BUT BEFORE 73399 TOTAL AC FC''S FOR THE INSPECTION REQUIREMENTS TOMC-APPROVAL FROM SC1ELBYC COMMENT QC REVIEW QC REVIEW RECORDS UPDATE INIT: PLN/ENG >72,399<73,399 TAFC T/A: 74,399 TAFC.......DH