What was found
ROTO PROBE INSPECTION SHOWS CRACK INDICATIO N AT FUSELAGE SKIN FR35, STR 30, RH SIDE, LOWER AFT HOLE INTERIM REPAIR PERFORMED PER PART 1 OF ECRA 5311-02126. DTA DIP INITIATED TO ACCOMPLISH A PERMANENT REPAIR ON OR BEFORE 10 OCT 1 9. PLANNING TO CONTACT ENGINEERING AFTER 10 AUG 2019 BUT BEFORE 10 SEP 2019 FOR PERMANENT REPAIR. NOTE TO PLANNING, THIS ECRA IS BEING EVALUATED FOR DAMAGE TOLERANCE UNDER 14CFR 26.43(D ) AND WILL LIKELY BE MADE PERMANENT WITH REPEAT INSPECTIONS INTERIM REPAIR PERFORMED PER PART 1 OF ECRA 5311-02126. PART 2 INSPECTION AND PART 3 PERM REPAIR TO BE DETERMINED BY ENGINEERING.