Service difficulty report · Frame · Boeing 75733N

Difficulty date
May 28, 2019
Submitted
May 31, 2019
Operation
Air carrier
Aircraft
N73860
Make and model
Boeing 75733N
Aircraft serial
32584
Aircraft time
49,802 hours, 14,317 cycles
Part
Frame
Part number
146N102897
Condition
Dented
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

B757-06-3-0243 DENT ON AFT CARGO FRAME UPPER FLANGE AT STA 1440 ABOVE STR 26L RG7 REF. ST.ENGINEERING N/R 0063855 AFT CARGO FRAME UPPER FLANGE DENT AT STA 1440 STR 26L FOUND TO BE OUT OF LIMITS (L=1.1" X W=1.0" X D=.040")IAW SRM 53-0 0-07 FIG 101.CUT OUT DAMAGE AND ACCOMPLISHED INTERM REPAIR IAW EC/RA N0. 5360-01520,REV-, PART 1 WORK ACCOMPLISHED ON ST.ENGINEERING N/R 0063855. DIP REQUIRED PER ECRA 5360-01520, PART 1, STEP 21, TO ACCOMPLISH INSPECTION REQUIREMENTS ON OR BEFORE A/C REACHING 31,800 TFC, PLANNING TO CONTACT ENGINEERING AFTER 24,800 TFC BUT BEFORE 25,800 TFC FOR INSPECTION REQUIREMENTS. DAMAGED IN 4C-CHK. DAMAGE OUT OF LIMITS PER SRM 1.34" X 1.18" IS OUT OF SRM LIMITS. PER ECRA 5360-01520 C/W INTERIM REPAIR PART 1. INITIATE DIP TO ACCOMPLISH INSPECTION REQUIREMENTS ON OR BEFORE THE ACFT REACHING 31,800 TOTAL CYCLES PER PART 2. PLANNING TO CONTACT ENGINEERING AFTER 24,800 CYCLES BUT BEFORE 25,800 CYCLES FOR INSPECTION REQUIREMENTS. AFT CARGO FRAME AT STATION 1440 JUST ABOVE STR 26L WAS FOUND TOMC-APPROVAL FROM SC1ELBYC COMMENT INSPECTIONS CREATED BY AUTODIP PENDING AIRCRAFT RECORDS AUDIT & UPDATE.

More about the Boeing 757-33N