Service difficulty report · Pump · Airbus A319131

Difficulty date
November 15, 2019
Submitted
November 16, 2019
Operation
Air carrier
Aircraft
N810UA
Make and model
Airbus A319131
Aircraft serial
843
Aircraft time
67,976 hours, 28,925 cycles
Part
Pump
Condition
Inoperative
Location
Fuel Boost
Stage of operation
CL
How discovered
V
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CTR TK PUMP1 INOP. ECAMCOMPLETED. MEL REQUESTED. DISPATCH DESK: 35 NAME: JG DATE: 11-NOV-19- APPROVED PER MEL 2821C AND DD DDP COMPLIED WITH REF TSM28-21-00-810-813-A, TRANSFERED FUEL TO CTR TANK VERIFIED PUMP 1 SUPPLY C/B CLOSED AND 69QA CNTOR- GFI NOT TRIPPED, LEFT CENTER PUMP NOT OPERATING WITH PUMP SELECTED TO ON. NEEDS FURTHER TROUBLESHOOTING FOR POWER AVAILABLE AT ALL 3 PHASES AT 37QA-A. IF SO REQUIRES 37 QA PUMP REPLACEMENT REPLACED CENTER TANK #1 FUEL PUMP PER AMM 28-21-51 NO HELP ROTABLE PARTS CHANGE WAS INDICATED - TT # 1077571 SN OFF 4244 PUMP, FUEL, MAI OFF 31-2821-9-9001 4244 ON 31-2821-9-9001 3136 ACCOMPLISHED INSTALLATION INPSPECTION OF CENTER TANK #1 FUEL PUMP IAW 28-21-51

More about the Airbus A319-131