What was found
DURING INSPECTION LEFT FRAMES 35-36 IAW EA5330-05216, FOUND MULTIPLE HOLES WITH DEFECTS AND CRACKS. ACCOMPLISHED INTERIM REPAIR IN REF TO PART 1 OF ECRA5331-02575, ACCOMPLISH PERMANENT REPAIR PER PART 3 OF ECRA 5331-02575, ON OR BEFORE 84597 FLIGHT CYCLES OR 180395 FLIGHT HOURS COMES FIRST REF ECRA 5331-02575 TO ACCOMPLISH INSPECTION REQUIREMENTS PER PART 2 ON OR BEFORE A/C REACHES 84,597 TOTAL FLIGHT CYCLES OR 182,395 TOTAL FLIGHT HOURS WHICHEVER OCCURS FIRST. PLANNING TO CONTACT ENGINEERING AFTER 75,000 FC BUT BEFORE 80,000 FC FOR INSPECTION REQUIREMENTS.