What was found
LH SIDE PRESSURE PANEL BETWEEN FR 35-36. NOTED CRACKS IN THE FOL LOWING HOLES: #1/2/4/5/6/7/8/9/10/13/14/17/20/22/26. NOTED REJEC TABLE INDICATIONS ON THE FOLLOWING HOLE # 30/32/34/35/38/39/40/4 3/45/46/48/53/54/58/59/60/63/65 AND I/B BRACKET HOLES: UPPER AND CENTER WITH DOT D001. PER HAECO LCQ N/R# 9296406 GENERATED. ACCOMPLISHED INTERIM REPAIR IAW ECRA 5331-02658 PART 1. REPAIRS A STEP 2. ACCOMPLISHED PER REOL22586 REV -. DTA REQUIRED IAW PART 1 OF ECR DIP 53-DIP MX REQUEST MORE INFO 3 OF THIS ECRA ON OR BEFORE 26SEP2020. PLANNING TO CONTACT ENG''G AFTER 26AUG2020 BUT BEFORE 10SEP2020 FOR PERMANENT REPAIR REQ''MT ACCOMPLISH PERMANENT REPAR AT LH FR35-36 PRESSURE PANEL PER PART OK TO PLACE ON DIP INTERIM REPAIR PER ECRA 5331-02658 PART 1 LH LH FR35-36 PRESSURE PANEL CRACKED HOLES, INSPECTION PER PART 2 I S NONE PERMANENT REPAIR PER PART TO BE ACCOMPLISHED ON OR BEFORE 26SEP2020. PLANNING TO CONTACT ENGINEERING AFTER 26AUG2020 BUT BEFORE 10SEP2020 FOR THE PERMANENT REPAIR REQUIREMENTS TOMC-APPROVAL FROM SC1ELBYC COMMENT QC REVIEWED QC REVIEWED RECORDS UPDATE INIT: >26AUG20<10SEP20 PLN/ENG T/A: 26SEP20...SN