What was found
PRESSURE DECK VERTICAL WEB IS CRACKED AT STA.663 AND APPROX. RB L 34. INSTALLED REPAIR DOUBLER PER SRM 57-10-10,REPAIR 3,ALTERNATIVE 2 .INITTIATED DIP TO PERFORM HFEC AND LFEC INSPECTIONS AT 56,000 F LIGHT CYCLES AFTER REPAIR INSTALLATION AND REPEAT INSPECTIONS AT INTERVALS OF 36,000 FLIGHT CYCLES THEREAFTER. REF. SRM 57-10-10, REPAIR 3,ALTERNATIVE 2,TABLE 205,P.217 AND FIG.207,P.219. SEE FL EET CYCLE L/P#9734901 FOR ALL WORK ACCOMPLSIHED. DIP APPROVED PRESSURE DECK VERTICAL WEB IS CRACKED AT STA.663 AND APPROX. RB L 34 INSTALLED REPAIR DOUBLER PER SRM 57-10-10,REPAIR 3,ALTERNATIVE 2 .INITTIATED DIP TO PERFORM HFEC AND LFEC INSPECTIONS AT 56,000 F LIGHT CYCLES AFTER REPAIR INSTALLATION AND REPEAT INSPECTIONS AT INTERVALS OF 36,000 FLIGHT CYCLES THEREAFTER. REF. SRM 57-10-10, REPAIR 3,ALTERNATIVE 2,TABLE 205,P.217 AND FIG.207,P.219. TOMC-APPROVAL FROM SC1ELBYC COMMENT VERIFIED REPAIR IS COMPLETED,ESFR HAS BEEN COMPLETED AND DIP ISS UED FOR REPEAT INSPECTIONS AT REQUIRED TIME. Q/C REVIEWED. Q/C REVIEWED. RECORDS UPDATE INIT: AT 56000 FC **INIT TO AUTO ITO TO RIR (-0556) RIR: EVERY 36000 FC...AN/U345625