What was found
LH LOWER HORIZONTAL SKN REPAIR REQUIRED FOR ACCESS TO STA. 92.7 RIB REPAIRS AT STIFFENERS #1 AND #2. CUT OUT SKIN FOR ACCESS TO RIB REPAIR. FABRICATED AND IUNSTALLED REPAIR DOUBLER PER SRM 55-10-01,REPAIR 11. INITIATED DIP TO PERF ORM A DETAIL VISUAL AND EXTERNAL LFEC INSPECTION AT 56,000 TOTAL FLIGHT CYCLES AND REPEAT INSPECTIONS AT INTERVALS OF 9,000 FLIGH T CYCLES THEREAFTER. REF. SRM 55-10-01,REPAIR 11,TABLE 204,P.223 AND 224. SEE FLEET CYCLE LOG PAGE 9735010 FOR ALL WORK PERORMED. INITIATED DIP TO PERF ORM A DETAIL VISUAL AND EXTERNAL LFEC INSPECTION AT 56,000 TOTAL FLIGHT CYCLES AND REPEAT INSPECTIONS AT INTERVALS OF 9,000 FLIGH T CYCLES THEREAFTER. REF. SRM 55-10-01,REPAIR 11,TABLE 204,P.223 AND 224. TOMC-APPROVAL FROM SC1ELBYC COMMENT VERIFIED REPAIR COMPLETED ON FLEETCYCLE N/R AND DIP ISSUED QC RECORDS UPDATE QC REVIEW INIT: 56,000 TAFC WILL ITO TO RIR (-0625) RIR: 9000 FC ...RJS/U250018