What was found
ENGINE 2 EXPERIENCED SIGNIFICANT STALLS ON CLIMB AT CLIMB POWER. ECAM CLEARED. LANDED W/BOTH ENGINE, REF ATTACHED PICTURES FOR FAILURES ON PFR AND FADEC 2B BOTH FADEC CHANNELS FOR NUMBER 2 ENGINE SELF TESTED FINE. ONLY FADEC 2B HAS FAILURES FOR LAST LEG ACCOMPLISHED HPC BSI, PER AMM 72-00-00-200-016-B. INSPECT CHIP DETECTORS, PER AMM 79-00-00-200-011-A. REMOVED AND REPLACED VSV ACTUATOR ON NR 2 ENGINE, AS PER AMM 75-32-41. NO FAULTS NOTED, REF LP-5711665 FOR ALL WORK PERFORMED (PERFORMED HIGH POWER ASSURANCE TEST NR 1 AND 11, PER AMM. OPERATIONS CHECKED GOOD.