What was found
L/H VERTICAL PRESSURE DECK CRACKED @ STA 663, LBL35. REPAIRED VERTICAL PRESSURE WEB PER SRM 57-10-10 REP 3. SEE FLEET CYCLE LOG PAGE 9767269 FOR ALL WORK ACCOMPLISHED. ISSUE DIP PER S TEP 7 INSPECTION REQUIREMENTS REF 57-10-10 REP 3 TABLE 205. INSP.THRESHOLD 56K CYCLES AFTER REPAIR INST.HFEC 36K FLT CYCLES- INITIAL WEB AND PT 1 REPAIR WEB FROM THE AFT SIDE (ARROW 1),PART 3 FILLER NOT COMMON TO THE PART 2 DOUBLER FROM THE FWD SIDE R COMPRESSION CHORD FROM THE AFT OR FWD SIDE(ARROW 5) LANGE OF THE LOWER ATTACH ANGLE FROM THE FWD SIDE (ARROW 6),UPPER (ARROW 2),PART 2 DOUBLER FROM THE FWD SIDE (ARROW 4),HORIZONTAL F 737NDT PART 6,51-00-00 PROCEDURE 4 OR 737 NDT PART 6 51-00- 00,PROCEDURE 23,UPPER COMPRESSION CORD REF 737NDT PART 6,51-00-0 0 PROCEDURE.LFEC 36K FLT CYCLES-PART 3 FILLER COMMON TO THE PART 2 DOUBLER FROM FWD SIDE (ARROW 3) REF 737 NDT PART 6,51-00-26.