What was found
FOR SCEPTRE TRACKING PURPOSE ONLY REMOVE AND REPLACE (A3NB-33-3- 6013) OPC EMERGENCY LIGHTING BATTERY CAPACITY WAS PERFORMED AND FAIL. THE TWO MESSAGES WERE EPSU UNIT FWD L AND EPSU BAT CAP AFT L. TROUBLE SHOOTING REQUIRED. FOR SCEPTRE TRACKING PURPOSE ONLY REMOVE AND REPLACE (A3NB-33-3- 6013) OPC EMERGENCY LIGHTING BATTERY CAPACITY WAS PERFORMED AND FAIL. THE TWO MESSAGES WERE EPSU UNIT FWD L AND EPSU BAT CAP AF L. TROUBLE SHOOTING REQUIRED. ROTABLE PARTS CHANGE WAS INDICATED - TT # 1248380 SN OFF 3461 POWER SUPPLY, C OFF 31-3350-9-9001 3461 ON 31-3350-9-9001 8098