Service difficulty report · Frame · Boeing 737900ER

Difficulty date
November 26, 2021
Submitted
November 29, 2021
Operation
Air carrier
Aircraft
N68452
Make and model
Boeing 737900ER
Aircraft serial
40005
Aircraft time
30,347 hours, 10,866 cycles
Part
Frame
Part number
144A2603
Condition
Punctured
Location
Rbl 35
Stage of operation
IN
How discovered
O
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

STA 727 BULKHEAD WEB PUNCTURE @RBL 35 C/W STEPS 3,4,7 AND 8 OF AVO9300. D.V. INSPECTIONS AND HFEC REF NDT PART 6. 51-00-00-23. NO DEFECTS NOTED. COMPLIED WITH STEPS 2,5 AND 6 OF AVO9300. NEED INSPECTION TO REF AVO9300 NEED STEP 9 ACCOMPLISHED BY INSPECTION COMPLY WITH STEPS 3,4,7 AND 8. C/W AVO9300 STEP #9. ACCOMPLISHED HFEC HOLE PROBE INSPECTION ON ALL REMOVED FASTENERS PER 737 NDT 51-00-00 PROCUDURE #16. NO DAMAGED NOTED. PROVIDED ESC WITH MAPOUT AND DIMENSIONS AND NOTIFIED THEM OF NDT FINDINGS PER STEP 10 OF AVO 9300. VERIFIED FILLER AND DOUBLER MATERIALS PER AVO 9300 , STEP VERIFIED FRABRICATION AND OKAY TO TREAT, PRIME, AND INSTALL ALL B1..QC424 REPAIR PARTS REF. AVO9300 REV. B. MATERIAL VERIFICATION REQUIRED FOR -1 REPAIR DOUBLER .050" PREVIOUS QC SIGN OFF FOR MATERIAL VERIFICATION WAS COMPLIED WITH DRILLED UP REPAIR DOUBLER AND FILLERS REF AVO 9300 REV B, OK TO 2024T-3 PO# 7229330, -2 STRUCTURAL FILLER .040" 2024 T3 PO# IAW AVO9300 REV. B TREAT, PRIME AND INSTALL DOUBLER AND FILLERS. 1553993, -3 STRUCTURAL FILLER .040" T3 PO# 1553993, -4 STRUCTURAL FILLER .050" 2024 T3 PO# 7229330. VERIFIED REPAIRED PARTS INSTALLATION IAW AVO 9300 STEP D 1-5. PENDING FINAL ECRA APPROVAL FOR REPAIR. INCORRECT SIGNE OFF FOR PART INSTALLATION, NEED TO INCLUDE STEP D. 1 - 5. REF AVO 9300 STEPS 4 AND 5 INSTALLED REPAIR PARTS, FILLET SEAL REF AVO 9300 STEP D INSTALLATION, INSTALLED REPAIR PARTS STEPS PREVIOUS STEP SIGNED OFF IAW AVO 9300 "REV. B". AND CORROSION COMPOUND. 1-5. 26-NOV-2021.