What was found
WHILE ACCOMPLISHING INSPECTIONS PER FCD 5330-05575D OF THE LH FUSELAGE KEEL BEAM MLG ATTACHMENT STRUCTURE, PRODUCTION REPORTED ALL HOLES OUT OF LIMITS AND ELONGATED. 02712. (SEE FIGURE 1 - 17 OF EC/RA 5311-02712 FOR LOCATIONS). ACCOMPLISH A PERMANENT REPAIR PER LATEST REVISION OF ACCOMPLISH A PERMANENT REPAIR PER LATEST REVISION OF WORK ACCOMPLISHED BY VTMAE EMPLOYEE V935774. EC/RA 5330-06891 ON OR BEFORE 7-JAN-2023. EC/RA 5330-06891 ON OR BEFORE 7-JAN-2023. PERFORMED INTERIM REPAIR LH FUSELAGE KEEL BEAM MLG ATTACHMENT STRUCTURE HOLES IN ACCORDANCE WITH EC/RA 5311 ADD EMP:V935774 OK TO DIP PER EC/RA 5330-06891 TILL ON OR BEFORE 07-JAN-23 TOMC-APPROVAL FROM SC1ELBYC COMMENT CORRECTING REFERENCE IN MAINTENANACE ACTION: QC REVIEWED RECORDS UPDATE...SP PERFORMED INTERIM REPAIR LH FUSELAGE KEEL BEAM MLG -06891 (SEE FIGURE 1 - 17 OF EC/RA 5330-06891 FOR LOCATIONS). WORK ACCOMPLISHED BY VTMAE EMPLOYEE V935774.