What was found
WHILE ACCOMPLISHING INSPECTIONS PER FCD 5330-05575D OF THE RH FUSELAGE KEEL BEAM MLG ATTACHMENT STRUCTURE, PRODUCTION REPORTED ALL HOLES OUT OF LIMITS AND ELONGATED. -06891 (SEE FIGURE 1 - 17 OF EC/RA 5311-02712 FOR LOCATIONS). ACCOMPLISH A PERMANENT REPAIR PER LATEST REVISION OF WORK ACCOMPLISHED BY VTMAE EMPLOYEE V935774. WORK ACCOMPLISHED BY VTMAE EMPLOYEE V935774. EC/RA 5330-06891 ON OR BEFORE 7-JAN-2023. ACCOMPLISH A PERMANENT REPAIR PER LATEST REVISION OF EC/RA 5330-06891 ON OR BEFORE 7-JAN-2023. PERFORMED INTERIM REPAIR RH FUSELAGE KEEL BEAM MLG ATTACHMENT STRUCTURE HOLES IN ACCORDANCE WITH EC/RA 5330 ADD EMP:V935774 OK TO TILL ON OR BEFORE 07-JAN-23 PER EC/RA 5330-06891 TOMC-APPROVAL FROM SC1ELBYC COMMENT CORRECTING WRONG REFERENCE IN PREVIOUS MX ACTIONS ENTERED, PERFORMED INTERIM REPAIR RH FUSELAGE KEEL BEAM MLG ATTACHMENT STRUCTURE HOLES IN ACCORDANCE WITH EC/RA 5330 -06891 (SEE FIGURE 1 - 17 OF EC/RA 5330-06891 FOR LOCATIONS). ADD EMP:V935774 QC REVIEWED INIT: SEE LP# 7832625 T/A: 07JAN23................VD/U353583