What was found
WHILE ACCOMPLISHING INSPECTIONS PER FCD 5330-05575D, PRODUCTION REPORTED MULTIPLE DISCREPANT/OVERSIZED HOLES IN THE RH KEEL BEAM MLG ATTACHMENT STRUCTURE. ECRA 5330-06914. ACCOMPLISH A PERMANENT REPAIR PER LATEST REVISION OF EC/RA 5330-06914 ON OR BEFORE 24-FEB-2023. PERFORMED INTERIM REPAIR TO HOLES R1, R3, R9, R7, R8, R10, R12, R16, R14, R18, R20, R11, R13, R16, R17, R19, R21, R83, AS PER ADD EMP:V935774 RII COMPLETED DIP 53-DIP PLEASE UPDATE LOG AND CONFIRM INTERIM REPAIR WAS ACCOMPLISHED AT HOLE "R15" PERFORMED INTERIM REPAIR TO HOLES R1, R2, R3, R9, R7, R8, R10, R ECRA 5330-06914. ACCOMPLISH A PERMANENT REPAIR PER LATEST R16, R14, R18, R20, R11, R13, R15, R17, R19, R21, R83, AS PER REVISION OF EC/RA 5330-06914 ON OR BEFORE 24-FEB-2023. CARRY ACTION RENTERED TO INCLUDE MISSED HOLE R3 AND R15 DURING INTITAL CARRY ACTION. INSPECTION CW AS PER PREVIOUS ENTRY ADD EMP:V933518