What was found
WHILE ACCOMPLISHING INSPECTIONS PER FCD 5330-05575D, PRODUCTION REPORTED MULTIPLE DISCREPANT/OVERSIZED HOLES IN THE LH KEEL BEAM MLG ATTACHMENT STRUCTURE. ACCOMPLISH A PERMANENT REPAIR PER LATEST REVISION OF EC/RA 5330-06914 ON OR BEFORE 24-FEB-2023. PERFORMED INTERIM REPAIR TO HOLES L1, L2, L3, L7, L8, L9, L10, L12, L14, L16, L18, L20, L11, L13 AS PER ECRA 5330-06914. ADD EMP:V935774 DIP 53-DIP NEEDS STATEMENT, "ACP''D INTERIM REPAIR PER PART 1 OF ECRA 5330-06914. ACCOMPLISH A PERMANENT REPAIR PER LATEST REVISION OF OF EC/RA 5330-06914 ON OR BEFORE 24-FEB-2023. EC/RA 5330-06914 ON OR BEFORE 24-FEB-2023. PERFORMED INTERIM REPAIR TO HOLES L1, L2, L3, L7, L8, L9, L10, L12, L14, L16, L18, L20, L11, L13 AS PER ECRA 5330-06914. ACCOMPLISHED RII AS PER BERG REVISED THE CARRY STATEMENT AS FOLLOWS: PERFORMED INTERIM REPAIR TO HOLES L1, L2, L3, L7, L8, L9, L10, L12, L14, L16, L18, L20, L11, L13 AS PER PART 1 OF ECRA 5330- 06914. ACCOMPLISH A PERMANENT REPAIR PER LATEST REVISION