What was found
PDA 3 BOTH NLG DOORS LEADING EDGE EROSION BOOT MISSING -- SEE PHOTO EXCEED 7 DAYS AND PERMANENT REPAIR PER PART 3 WITHIN 30 DAYS. PERFORMED INTERIM REPAIR PER PART 1 OF ECRA 5280-01284 REV-C. ISSUE DIP INSP INTERIM REPAIR PER PART 2 AT INTERVALS NOT TO TOMC APPROVED DIP TO INSPECT INTERIM REPAIR PER PART 2 OF ECRA TOMC-APPROVAL FROM SC1ELBYC COMMENT 5280-01284 AT INTERVALS NOT TO EXCEED 7 DAYS. INSTALL PERMANENT REPAIR PER PART 3 OF ECRA WITHIN 30 DAYS. ADDED PHOTO QC REVIEWED RECORDS UPDATE...SP QC REVIEWED RIR: 07 DAYS T/A: 30 DAYS...SP/U366013