What was found
ESCAPE SLIDE PACK PRESSURE GAUGE DAMAGED DOOR 1L DAYS, IAW ECRA 2566-01215 ACCOMPLISH REPETITIVE INSPECTION PRIOR TO ECAH FLIGHT PER PART 2 AND ACCOMPLISH A PERMANENT REPAIR PER PART 3 WITHIN 3 CALENDAR ESCAPE SLIDE CALM SHELL VIEWING PORT TRANSPARENT PLASTIC COVER TOMC-APPROVAL FROM SC1ELBYC COMMENT DETACHED FROM ASSEMBLY. INTER REPAIR COMPLIED WITH BY SECURING COVER. TOMC APPROVED TO ACCOMPLISH REPETITIVE INSPECTION PRIOR TO EACH FLIGHT PER PART 2 AND ACCOMPLISH PERMANENT REPAIR PER PART 3 WITHIN 3 CALENDAR DAYS IN REFERENCE WITH ECRA 2566-01215. ATTACHED PICTURE RECORDS REPLACED THE 1L ESCAPE SLIDE PACK PRESSURE GAUGE INSPECTION WINDOW REF AMM 25-66-01. VERIFIED REPLACEMENT ESCAPE SLIDE PACK PRESSURE GAUGE INSPECTION WINDOW REF. AMM