What was found
TOTAL LOSS OF GREEN HYD SYS, #1 ENGINE DRIVEN HYD PUMP REQUIRES REPLACEMENT. REPLACED HYD PUMP . STOPPED AT STEP CORRECTING M&E SN COMPLETED #1 EDP INSTALLATION. LEAK CHECK REQUIRED. REPLACED POWER TRANSFER UNIT, REQUIRES OPS D.3 ROTABLE PARTS CHANGE WAS INDICATED - SN OFF 0752 IPC REFERENCE # 29-11-51-01 UNIT, TRANSFER OFF 31-2920-9-0001 0752 ON 31-2920-9-0001 1585 SERVICED HYDRAULIC SYSTEMS AND PERFORMED BLEED PUMP, HYDRAULIC OFF 31-2914-9-9003 8683 ON 19-2910-9-0003 6395