What was found
GEN 1 FAULT ON TAKE OFF ROLL REQUESTING DEFERAL FOR #1 ENGINE GENERATOR ITEM PLACE ON MEL DDP COMPLIED WITH IN DEFERRED ITEM TEXT STATE RESTORING INOPERATIVE IDG TO SERVICE, PYLON MOUNTED IDG AD2011-19-01 R1 REQUIREMENTS: THE FOLLOWING: "PRIOR TO CLEARING THIS DEFERRED ITEM AND CONNECTORS MUST BE VISUALLY INSPECTED FOR ARCING CONDITIONS, PER DISPATCH DESK: 39 NAME: AS DATE: 23-JUL-22- NOC DESK: 320 NAME: CS DATE: 23-JUL-22- MEL APPROVED. INSPECTED FEEDER CABLES ON IDG NO BURN MARKS OR DEFECTS NOTED. DPI IS NOT POPPED. FOUND IDG OIL IS NOT IN SITE GAUGE. SERVICED IDG OIL AS REQUIRED PER 12-13-24 REQUIRED ENGINE RUN T/S TO IDG WHICH IS NIS EWR. FOR LEAK CHECK AND CONNECT. TO ORIGINAL AUTOLAND CAPABILTY. ROTABLE PARTS CHANGE WAS INDICATED - TT # 1832923 SN OFF 1366 REMOVED AND REPLACED #1 ENGINE IDG AS PER AMM 24-21-51. UPDATING FOR CAT PERFORMED OPS AND LEAK CHECK. NO DEFECTS NOTED. NEED TO UPGRADE ADD EMP:U341132 GENERATOR, INTE OFF 31-2411-9-0001 1366 ON 31-2411-9-0001 8218 REMOVED AND REPLACED #1 ENGINE IDG AS PER AMM 24-21-51. PERFORMED OPS AND LEAK CHECK. NO DEFECTS NOTED. THIS IS A SUPPLEMENTAL REPORT FOR THE SAME CONTROL NUMBER SUBMITTED ON 7/27/22.GEN 1 FAULT ON TAKE OFFROLL.FOUND IDG OIL IS NOT IN SITE GAUGE. REMOVED AND REPLACED #1 ENGINE IDG. PERFORMED OPS AND LEAK CHECK. NO DEFECTS NOTED.