What was found
DOOR 1L DIDNT SEAL ON TAKEOFF VERIFIED RII REQUIREMENTS OF L1 DOOR ADJUSTMENT PER AMM 52-11-00 AND GMM 09-25-05. CHECKED THE L1 ENTRY DOOR OPERATION AND FOUND THE GUIDE ARM SLIGHTLY OUT OF ADJUSTMENT CAUSING UPPER AFT LATCH RECEIVER TO HANG UP. ADJUSTED GUIDE ARM REF AMM 52-11-00 AND CHECKED DOOR OPERATION NORMAL ON TEST IAW AMM 52-11-00. AFTER L-1 DOOR ADJUSTMENT, INSPECTED DOOR SEAL FOR ANY DEFECTS. NONE FOUND. PRESSURIZED ACFT AND ACCOMPLISHED A LEAK CHECK OF DOOR AND FOUND NO LEAKS. ACFT PRESSURIZED NORMALLY. LOG CLEARED.