Service difficulty report · None · Boeing 777

Difficulty date
September 23, 2022
Submitted
September 23, 2022
Operation
Air carrier
Aircraft
N228UA
Make and model
Boeing 777
Aircraft serial
30556
Aircraft time
79,354 hours, 9,363 cycles
Part
None
Part number
NA
Condition
None
Location
Panel 511fb
Stage of operation
IN
How discovered
O
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LEFT WING LEADING EDGE PANELS FOIL/MESH INSPECT {B777-20-3-7002} - PANEL 511 FB CONDUCTIVITY TAPE NEEDS TO BE REPAIR CLEARED TO APPLY CONDUCTIVE REPAIR TAPE REPAIR IS A MAJOR REPAIR REMOVED DAMAGED ALUMINUM FOIL TAPE ON PANEL 511 FB. REQUIRES INSPECTION PRIOR TO PERMANENT REPAIR REF SRM 51-70-14-2R-3. ADD EMP:U393575 APPLIED CONDUCTIVE TAPE AND SEALANT REF SRM 51-70-14-2R-3. ACCOMPLISHED INSPECTION OF TAPE APPLICATION IAW SRM 51-70-14-2R-3. STEP 6