What was found
BULK CARGO BETWEEN FRS 63-64, STRG 40L-43L EXISTING DOUBLER HAS CORROSION OR RE-INSPECTION PER SRI. SRI REQUIREMENTS AS FOLLOWS: FIRST INS ER OCCURS 1ST, SUBSEQUENT INSPECTIONS AT INTERVALS OF 2,000FC/4, OR CONCERNING NTM CHAPTERS IAW SRI 53-00-11-205-017, REF VT AERO PECTION DUE AFTER REPAIR EMBODIMENT AT 21,200FC/42,400FH WHICHEV 400FH, INSPECTION METHOD ULTRASONIC/HFEC REFER TO FIG 1 OF SRI F SPACE NRC 38658. REMOVED SRM DOUBLER AT FR63-64 STRG 40-43L AND INSTALLED NEW DOU BLER REPAIR IAW SRM 53-00-11-300-029, CAT B MAJOR.