What was found
FCTL SPLR FAULT AT CRZ SPLRS APPEAR FLUSH, INOP SYS SPLR 5 INSPECTED WIRING AT NR 5 SPOILER ACTUATORS, NO DAMAGE FOUND. VERIFIED INSTALLATION OF #5 SPOILER , SAFETY AND SECURITY OF COMPONENT UP TO 4 C 9 IAW GMM 09-25-05. ACCOMPLISHED CONTINUITY CHECKS AND MEGGED ALL WIRING FROM SEC2. REMOVED NUMBER 5 SPOILER ACTUATOR IAW AMM 27-64-52-000-004-A, REMOVED AND REPLACED NUMBER 5 SPOILER SERVO CONTROL OUBD REF TO SPOILER 5 LT AND RT. ALL CHECKED GOOD IAW AMM 27-94-19, 3 CHECKED POS XDCR LT AND RT IAW TSM 27-60-00-810-845-A. VALUES WITHIN LIMIT COMPLETED INSTALLATION IAW MM 27-64-52-400-004-A. ADJUSTED SPOILER IAW MM 27-64-00-820-001-C. OPS AND LEAK CHECKED GOOD. OPERATIONAL TEST, LEAK CK GOOD IAW GMM 09-25-05.