As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
STATION 760 RIGHT CABIN FRAME CRACKED AT I/B RIVET FOR PSU RAIL ATTACH BRACKET.INSPECTIONS PER PART 5.A. TABLE 203 AND FIGURE 203 SHEET 2 FOR ZO EPAIR 8 AT 12000 FLIGHT CYCLES FROM REPAIR INSTALLATION AND REPE DETAILED VISUAL INSPECTION. NE 3 REPAIR. NEED TO PERFORM INSPECTIONS AS GIVEN IN TABLE 203/R AT INSPECTIONS AT 12000 FLIGHT CYCLE INTERVALS.