What was found
STATION 760 LEFT CABIN FRAME CRACKED AT I/B RIVET FOR PSU RAIL ATTACH BRACKET. PLEMENTAL INSPECTIONS PER SRM 53-00-07-2R-8 PART 5.A. TABLE 203 TIONS AS GIVEN IN TABLE 203/REPAIR 8 AT 12000 FLIGHT CYCLES FROM E INTERVALS. REPAIR METHOD IS DETAILED VISUAL INSPECTION. AND FIGURE 203 SHEET 2 FOR ZONE 3 REPAIR. NEED TO PERFORM INSPEC REPAIR INSTALLATION AND REPEAT INSPECTIONS AT 12000 FLIGHT CYCL REPAIRED FRAME CRACK PER ECRA 5310-08095 AND SRM 53-00-07-2R-8 ( SEE HANGAR NR 1086003 FOR DETAILS). INITIATED DIP TO PERFORM SUP DIP CREATED DUE TO STATION 760 LEFT CABIN FRAME CRACKED AT I/B TOMC-APPROVAL FROM SC1ELBYC COMMENT RIVET FOR PSU RAIL ATTACH BRACKET. REPAIRS REF HANGAR LP 1086003. PER SRM 53-00-07-2R-8 REPAIR STEP 5 PERFORM SUPPLEMENTAL INSPECTIONS PER PART 5.A TABLE 203 AND FIGURE 203 SHEET 2 ZONE 3 REPAIR. PERFORM REPEAT INSPECTIONS EVERY 12000 FLT CYCLES. INSP REQUIRED IS A DETAILED VISUAL. INSPECTIONS CREATED BY AUTODIP PENDING AIRCRAFT RECORDS AUDIT & UPDATE. FIRST. REPEAT INSPECTION EVERY 12000 FLT CYCLES AFTER INITIAL INSPECTION.*** **UPDATED LIMITS** 12,000 FLIGHT CYCLES FROM REPAIR QC REVIEWED QC REVIEWED INSTALLATION, OR 50,000 AIRFRAME FLIGHT CYCLES, WHICHEVER COMES QC REVIEWED QC REVIEWED