What was found
DURING FRAME REPAIR PER SRM 53-00-07-2R-8, REPAIR 8 - A/C BRKT LOCATION STA 1540 LT SIDE, A CRACK INDICATION WAS FOUND AT STR 9LT STR TIE I/B FASTENER LOCATION. AT THE STR 8LT STR TIE LOCATION, THE O/B FASTENER LOCATION WAS DRILLED IN ERROR TO .430. THIS LOG PAGE IS FOR DIP TO PERFORM SUPPLEMENTAL INSP REQUIREMENTS PER ECRA 5310-08101 DMG FOUND AT S-9L I/B STR CLIP HOLE AND S-8L O/B STR CLIP HOLE. M 53-00-07 REP 8 WITH DEVIATIONS NOTED IN ECRA 5310-08101. ACCOM T 3 WITHIN 18 MONTHS FROM JAN. 10 2023 FRAME REINFORCEMENT AND FREEZE PLUG REPAIRS ACCOMPLISHED PER SR PLISH A PERMANENT REPAIR PER ECRA 5310-08101(LATEST REV) PER PAR INTERIM REP WAS C/W AT STA 1540 FRAME BETWEEN S-8L AND S-9L FOR CRACK FOUND AT PSEU RAIL MOUNT I/B FASTENER HOLE WITH ADDITIONAL.