What was found
RH MLG DOOR ACT FITTING REPAIRED AREA. CREATE DIP FOR PLANNING PURPOSES ONLY. 32,170 TOTAL ACFT FC BUT BEFORE 32,200 TOTAL ACFT FC FOR THE NR 9294007. ECRA 5330-07042 PART 3 PERM RPR INSTRUCTIONS. WRK ACMP ON HAECO IAW ECRA 5330-07042 PART 1.3. AT THE RPAIRED AREA OF THE RH MLG DOOR ACT FITTING,*-. AT THE REPAIRED AREA OF THE TOMC-APPROVAL FROM SC1ELBYC COMMENT RH MLG DOOR ACTUATOR FITTING, PLANNING TO CONTACT ENGINEERING AFTER 32,170 TOTAL AIRCRAFT FLIGHT CYCLES BUT BEFORE 32,200 TOTAL AIRCRAFT FLIGHT CYCLES FOR THE ECRA 5330-07042 PART 3 PERMANENT REPAIR INSTRUCTIONS. NOTE TO PLANNING: THIS ECRA IS BEING EVALUATED FOR DAMAGE TOLERANCE UNDER 14CFR 26.43D.