What was found
LH MAIN FUEL QTY HARNESS NEEDS SEALING AT BUSSING PLUG AND 2 EACH INTERNAL GROMETS AT RIB FEED THROUGH . REF AMM 28-41-09 INSTALLED BUSSING PLUG AND SEALED GROMET AT PANEL 541JB/HB COMPLETED SEALING GROMETS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LH MAIN FUEL QTY HARNESS NEEDS SEALING AT BUSSING PLUG AND 2 EACH INTERNAL GROMETS AT RIB FEED THROUGH . REF AMM 28-41-09 INSTALLED BUSSING PLUG AND SEALED GROMET AT PANEL 541JB/HB COMPLETED SEALING GROMETS.