Service difficulty report · Unknown · Airbus A320232

Difficulty date
March 30, 2023
Submitted
March 31, 2023
Operation
Air carrier
Aircraft
N448UA
Make and model
Airbus A320232
Aircraft serial
842
Aircraft time
74,582 hours, 31,117 cycles
Part
Unknown
Part number
D5337203520000
Condition
Damaged
Location
Lh Frame 35
Stage of operation
IN
How discovered
O
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING ACCOMPLISHMENT OF EA 5310-07772 REV. ORIG OP 001 (SB 53-1383 R00), HOLES 2 &4 ON THE LH FRAME 35 AND HOLES 1, 2 & 3 ON THE RH FRAME 35 WERE FOUND DAMAGED. DURING REPAIR EMBODIMENT, HOLES #10 ON BOTH THE LH / RH SIDE WERE FOUND TO BE OUTSIDE OF EA 5310-07772 REV. ORIG OP 004 (SB 53-1372 R01) REQUIREMENTS. PT 1 WITH NO DEVIATIONS. "PLANNING TO CONTACT ENGINEERING AFTER 13-JULY-2023, BUT STGR30 LH/RH HOLES PER THE LATEST REVISION OF EC/RA 5330-07066." BEFORE 13-AUG-2023 FOR PART 3 PERMANENT REPAIR ON THE FR35 ACCOMPLISHED INTERIM REPAIR INSTRUCTIONS PER REF /J/ VT MAE EA 320-5321-13-A3111 REV. ORIGINAL IAW UAL ECRA 5330-07066 REV A ENGINEERING AFTER 13JUL23, BUT PRIOR TO 13AUG23 FOR FINAL REQUIREMENTS ON THE FR35 STGR30 LH/RH HOLES PER THE LATEST DISPOSITION OF INTERIM REPAIR, OR, PERMANENT REPAIR INSPECTION REVISION OF ECRA 5330-07066 PART 3. ARMENTA TOMC REF INTRIM REPAIR ACCOMPLISHED ON LOG PAGE 4191692: PLANNING TO TOMC-APPROVAL FROM SC1ELBYC COMMENT CONTACT ENGINEERING AFTER 13JUL23, BUT PRIOR TO 13AUG23 FOR FINAL DISPOSITION OR INTERIM REPAIR OR PERMANENT REPAIR INSPECTION REQUIREMENTS ON THE FR35 STGR30 LH/RH HOLES PER THE LATEST REVISION OFECRA 5330-07066 PART 3. ARMENTA TOMC CORRECTION TOMC TEXT SHOULD READ: REF INTERIM REPAIR QC RECORDS UPDATE ACCOMPLISHED ON LOG PAGE 4191692: PLANNING TO CONTACT QC REVIEWED T/A: PLN/ENG >13JUL23 <13AUG23...KJB

More about the Airbus A320-232