What was found
DURING ACCOMPLISHMENT EA 5310-06784 REV A OP 003 (SB 53-1286 REV 01), HOLE DISCREPANCIES WERE NOTED ON LH/RH FR16/FR20 CROSSBEAMS. 5311-02962 PT 1 WITH NO DEVIATIONS. "LHS FR16 WAS REPLACED + LH/RH FR16/FR20 CROSSBEAM REPAIR IS A PERMANENT SOLUTION WITH INSPECTION PER PART 2 OF LATEST REVISION OF EC/RA 5311-02962 ON HOLES WERE REPAIRED WHILE SUBJECTA/C WAS AT BFM. REQUIREMENTS. ACCOMPLISHINSPECTION REQUIREMENTS OR BEFORE THE AC REACHING 73,917FC''S." ACCOMPLISHED INTERIM REPAIR INSTRUCTIONS PER VT MAE EA 320-5310-13-A3133 REV. ORIG. IAW UAL ECRA APPROVED FOR DIP IAW ECRA 5311-02962 INTERIM REPAIR PER PART 1 , TOMC-APPROVAL FROM SC1ELBYC COMMENT PER PART 2 INSPECTION REQUIREMENTS TBD, PER PART 3 PART 1 REPAIR REPETATIVE INSPECTION REQUIREMENTS STATED IN PARTS, NO TERMINATIING ACTION, REQUIREMENTS PER PART 2 OF LATEST REVISION OF EC/RA 5311-02962 ON OR BEFORE THE AIRCRAFT REACHING 73,917 TOTAL FLIGHT CYCLES." QC QC REVIEWED. T/A : 73917 TAFC....HC/U389717 RECORDS UPDATE......HC